Super Copper discovers new high-grade copper zones at Cordillera Cobre Project, Chile

Share this article

Super Copper Corp. [CSE: CUPR; OTCQB: CUPPF; FSE: N60] reported Phase 1 exploration results from its flagship Cordillera Cobre Project, located in Chile’s Atacama region. Cordillera Cobre is one of two copper exploration assets held by the Company in the Atacama belt, alongside the Castilla Project, which Super Copper acquired in 2025 and is advancing through early-stage exploration.

Phase 1 represents its most significant field program to date: two new high-grade copper zones discovered in a completely undrilled area, with excellent surface grades confirmed across three distinct target areas, and structural controls on mineralization mapped across 800+ hectares via ground magnetometry. The IP survey is now complete, with chargeability data being processed for near term release.

Highlights: Two new high-grade copper zones discovered in the northern project area, returning up to 7.13% Cu and 4.78% Cu from rock grab samples of outcrop, in an area with no prior drill testing.

A total of 24 of 102 rock grab samples exceeded 1% copper, with 10 samples returning greater than 3% Cu, demonstrating widespread high-grade mineralization across multiple target areas.

Excellent surface grades confirmed at three distinct target areas – Northern Showing: 7.13% Cu with 98.7 g/t Ag (new discovery); Anima Mine Trend: 6.92% Cu over 1 metre in chip samples and Calcite Hill: 3.40% Cu over 1 metre in chip samples.

El Alto Historical Trench T-267A returned 17 metres grading 0.34% Cu, including 2 metres at 1.48% Cu in chip samples, demonstrating continuity and width potential, and potentially indicative of a structurally controlled system at depth.

An IP survey is now complete across El Alto and Calcite Hill target areas; chargeability results to be released imminently.

Super Copper’s Phase 1 results at Cordillera Cobre include samples grading up to 7.13% Cu across multiple target areas, well above typical mine grades in the region.

The combination of high-grade copper exposed at surface, multiple mineralized zones, and structural controls now defined by geophysics de-risks the path to targets and provides a technical foundation for high-confidence drill target selection. These combined results indicate the potential for a larger, structurally controlled copper system rather than isolated high-grade occurrences.

Phase 1 prospecting identified two previously unknown high-grade copper zones in the northern portion of Cordillera Cobre, an area not covered by historical drilling. The newly designated Northern Showing returned 7.13% Cu with 98.7 g/t Ag and 4.78% Cu in rock grab samples from outcrop. Mineralization is hosted in breccias and veins within diorite (northernmost cluster) and volcaniclastic rocks, and appears structurally controlled, with the two zones located approximately 1.5 km apart.

The 1.5-km separation between the two zones, combined with consistent structural orientation, suggests these are not isolated occurrences but surface expressions of a broader mineralized system, one that has received no drill testing to date. The Northern Showing is now a priority target for follow-up work alongside El Alto and Calcite Hill.

The program resulted in the collection of 102 rock samples from outcrops, trenches, and underground workings. Results are summarized in original press release.

Ground magnetometry across 800+ hectares reveals a coherent set of northwest-trending structural corridors controlling mineralization at both Calcite Hill and El Alto. Magnetic low anomalies, reflecting magnetite destruction by hydrothermal fluids, a hallmark of Atacama copper systems, are spatially coincident with the project’s highest-grade surface samples.

The magnetometry data has now been integrated with an Induced Polarization (IP) survey across both the El Alto and Calcite Hill target areas. IP chargeability results will be released in a subsequent announcement. While magnetics define where the hydrothermal system was active, IP chargeability pinpoints potential disseminated sulphide concentrations at depth, which will help convert structural targets into high-confidence drillable targets. The full dataset will advance the company toward its Phase 1 drill program, targeted for Q2 2026.

Zachary Dolesky, CEO of Super Copper, stated: “What Phase 1 has given us is a fundamentally different company than six months ago. What began as a single historic target has evolved into multiple high-priority copper zones across a large structurally controlled system. With high-grade copper now confirmed at surface and geophysics defining drill targets, we are moving toward our first drill program with the strongest target pipeline in the Company’s history.”

The Phase 1 campaign marks the company’s most comprehensive field program to date at Cordillera Cobre, designed to validate historical drill results and generate new data across multiple high-priority copper zones to support drill target definition.

All rock samples were submitted to ALS Laboratories in Chile for geochemical analysis. The geophysical survey was carried out by Argali Geophysics. These results form the foundation for Super Copper’s next phase of target definition, with Phase 1 drilling targeted for Q2 2026.

Super Copper is advancing its copper projects in Atacama, Chile, a region with world-class infrastructure and the presence of global majors.


Share this article

Leave a Reply

Your email address will not be published. Required fields are marked *

×