Maritime Resources Traces Orion North Zone Over 550 Metres – Intersects 12.43 gpt Gold and 2.15 gpt Silver Over 1.20 Metres, Including 50.60 gpt Gold and 7.90 gpt Silver Over 0.20 Metres

Share this article

Maritime Resources Corp. (TSXV: MAE) (“Maritime” or the “Company”) is pleased to announce drill results from its ongoing 40,000 metre (“m”) exploration program at the Hammerdown Gold Project (“Hammerdown” or the “Project”), and its Whisker Valley Property, in the Baie Verte Mining District of Newfoundland and Labrador, Canada. Exploration activities are underway with two drills exploring along the highly prospective Hammerdown Deformation Zone and will work outwards to new high priority targets throughout 2021 and into 2022.

Highlights:

Orion North – new near surface zone traced over 550m

  • Drill hole BB-21-170 intersected 12.43 gpt Au and 2.15 gpt Ag over 1.20 m, including 50.60 gpt Au and 7.90 gpt Ag over 0.20 m.
  • The northernmost drillhole BB-21-176 intersected 10.68 gpt Au and 2.70 gpt Ag over 0.33 m and is open towards the Hammerdown deposit.
  • Drill hole BB-21-175 intersected multiple high-grade veins containing 6.79 gpt Au over 0.20 m, 17.08 gpt Au over 0.20 m, 11.48 gpt Au over 0.20 m and 10.19 gpt Ag over 0.20 m, all within 100 vertical meters from surface.

Orion – Additional drilling targets areas of thicker, high grade shoots of mineralization to greater depths

  • BB-21-167, drilled 60 m beneath a newly identified thick high-grade shoot of the Orion Deposit, intersected 33.35 gpt Au and 5.40 gpt Ag over 0.24 m and 3.72 gpt Au over 7.14 m, including 5.69 gpt Au over 3.53 m.
  • BB-21-154 intersected numerous mineralized zones with 2.30 gpt Au and 0.50 gpt Ag over 12.00 m, including 5.19 gpt Au and 1.01 gpt Ag over 3.50 m.

Whisker Valley – Gary vein system defined over 1,000 m in strike length during 2020 drilling

  • Updated results from Whisker Valley drill hole WH-20-12 identified a new upper mineralized lens that returned 23.40 gpt Au, 46.80 gpt Ag and 0.64% Cu over 0.34 m. Screened metallic sieve analysis of the previously announced interval from WH-20-12 mineralization significantly upgraded the grade of the mineralized intercept to 5.74 gpt Au over 6.32 m, including 22.42 gpt Au, 14.08 gpt Au and 0.35% Cu over 0.50 m and 9.63 gpt Au, 3.06 gpt Ag and 0.08% Cu over 2.60 m.
  • WH-20-20 Intersected multiple narrow high-grade intervals containing 5.07 gpt Au and 3.78 gpt Ag over 1.23 m, including 11.07 gpt Au and 8.49 gpt Ag over 0.53 and 3.53 gpt Au, 1.83 gpt Ag and 0.14% Cu over 1.18 m, including 18.24 gpt Au, 6.0 gpt Ag and 0.65% Cu over 0.20 m.

“Drilling at Orion North continues to intersect high-grade mineralization over narrow widths. This new zone of mineralization has now been traced over 550 m in strike length to a depth of 100 m below surface. We are encouraged to see continuity and multiple new high-grade veins being intersected in shallow, broadly spaced exploration holes as we test the gap between the Hammerdown and Orion Deposits. As drilling continues to test this minimally explored corridor, there is a strong probability for the discovery of additional mineralized veins,” commented Garett Macdonald, President and CEO. “At Whisker Valley our initial exploration program completed in 2020 successfully traced gold mineralization over a strike length of 1,000 m and to depths of 150 m below surface. It is common for narrow vein gold deposits to pinch and swell and we will be focused on locating wider zones that may be amenable to extraction,” added Mr. Macdonald.

Orion Deposit

Recent drilling at the Orion deposit and new Orion North zone have intersected several quartz veins containing high-grade gold and meaningful amounts of silver. These zones lie along the Hammerdown deformation zone, an important 4-km long trend hosting the Orion and Hammerdown gold deposits, that has seen minimal exploration drilling over the years. The Orion North zone lies between these deposits and has now been traced over a strike length of 550 m and is open to the northeast. Drilling on this zone recently intersected 12.40 gpt Au and 2.15 gpt Ag over 1.20 m, including 50.60 gpt Au and 7.90 gpt Au over 0.20 m in drill hole BB-21-170 near surface, at a depth of 35 m. Along strike, approximately 50 m to the northeast towards Hammerdown, drill hole BB-21-175 intersected six new quartz veins starting at 46.00 m and extending to 131.88 m down the hole including 0.86 gpt Au over 3.85 m, 17.08 gpt Au over 0.20 m, 11.48 gpt Au over 0.20 m and 10.19 gpt Au over 0.20 m. The Orion North zone is open in all directions.

Drilling at the main Orion zone is focused on testing the extents of two styles of mineralization – narrow quartz veins with high-grade gold and quartz feldspar porphyry (“QFP”) dykes with wide zones of lower grade disseminated gold. Drill hole BB-21-154 intersected 2.30 gpt Au over 12.00 m, including 5.19 gpt Au over 3.50 m at a depth of 195 m below surface. Other notable intersections at Orion included 4.19 gpt Au over 3.00 m in drill hole BB-21-158 and 4.13 gpt Au over 2.28 m in drill hole BB-21-161. Deeper in the Orion deposit, drill hole BB-21-167 intersected the EMS zone at 219.04 m downhole with 33.35 gpt Au and 5.40 gpt Ag over 0.24 m and the main zone at 346.89 m downhole with 3.72 gpt Au over 7.14 m, including 5.69 gpt Au over 3.53 m. The main Orion zone remains open at depth and along strike.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/88274_810b96c604cd2884_001.jpg

Figure 1: Drill Hole Location Map (Orion to Hammerdown) Click to enlarge

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/88274_810b96c604cd2884_002.jpg

Figure 2: Long Section (Orion to Hammerdown) click to enlarge

Whisker Valley

Maritime’s 2020 exploration program at Whisker Valley’s Gary vein system defined a new zone of multiple veins containing gold, silver and copper mineralization spanning over 1,000 m in strike length down to a vertical depth of 150 m. This zone remains open in all directions. Additional assay results for drill hole WH-20-12 returned 23.40 gpt Au, 46.80 gpt Ag and 0.64% Cu over 0.34 m starting at 93.55 m downhole. Updated results were also received by re-assaying the previously released interval from 166.95 m (see press release dated November 5, 2020) with screened metallics due to the presence of coarse gold. With this new information, the re-assayed interval now grades 5.74 gpt Au over 6.32 m, including 22.42 gpt Au, 14.08 gpt Au and 0.35% Cu over 0.50 m and 9.63 gpt Au, 3.06 gpt Ag and 0.08% Cu over 2.60 m.

Additional drilling included drill hole WH-20-20, collared 50 m west of WH-20-12 which also intersected two veins with 5.07 gpt Au and 3.78 gpt Ag over 1.23 m, including 11.07 gpt Au and 8.49 gpt Ag over 0.53 m starting at 71.20 m, and 3.53 gpt Au, 1.83 gpt Ag and 0.14% Cu over 1.18 m, including 18.24 gpt Au, 6.0 gpt Ag and 0.65% Cu over 0.20 m starting at 191.72 m. A number of additional geological and geophysical targets were drilled in 2020 targeting mineralization outcropping east of the historic Mackenzie Showing including drill hole WH-20-19 which intersected 3.33 gpt Au and 2.49 gpt Ag over 0.86 m including 0.30 m grading 6.96 gpt Au and 4.7 gpt Ag. Additional drilling is planned in 2021 at Whisker Valley to follow up on the depth extensions of the Gary vein system and test several strong geophysical targets. In total eight drillholes comprising of 1,856 m were completed at the Gary vein system in 2020. A ninth hole (WH-20-21) was drilled to a depth of 82.0 m and was lost due to faulting.

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/88274_810b96c604cd2884_003.jpg

Figure 3: Drill Hole Location Map – Whisker Valley (click to enlarge)

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/4548/88274_810b96c604cd2884_004.jpg

Figure 4: Long section – Whisker Valley (click to enlarge)

Table 1: Orion and Hammerdown

Hole ID From To Length Au g/t Ag g/t
Orion
BB-21-150 95.3 95.9 0.6 2.73 0.77
BB-21-150 139.7 140.1 0.4 1.26 0.10
BB-21-151 195.6 195.8 0.2 2.71 6.10
BB-21-151 232.0 234.0 2.0 0.61 0.10
BB-21-151 298.0 299.0 1.0 1.28 0.40
BB-21-151 301.0 301.4 0.4 0.57 0.60
BB-21-151 306.2 311.3 5.1 1.34 0.23
Including 306.2 306.8 0.6 6.85 0.47
Including 307.6 307.8 0.2 0.86 0.10
Including 308.3 309.5 1.2 1.31 0.27
Including 311.1 311.3 0.2 2.24 0.10
BB-21-151 321.6 323.0 1.4 2.15 1.10
BB-21-151 332.9 333.5 0.6 0.89 2.60
BB-21-152 40.8 41.0 0.2 11.25 14.00
BB-21-152 43.5 43.7 0.2 43.81 10.50
BB-21-152 50.0 51.0 1.0 0.67 0.10
BB-21-152 69.4 70.0 0.5 0.93 0.20
BB-21-152 86.0 87.4 1.4 1.81 2.03
BB-21-152 95.0 99.0 4.0 0.69 0.18
BB-21-152 101.2 103.0 1.8 0.72 0.32
BB-21-152 110.8 111.0 0.2 24.70 5.90
BB-21-152 128.6 130.0 1.4 0.84 0.1
BB-21-152 132.0 132.6 0.6 3.64 0.8
BB-21-152 138.0 139.0 1.0 1.09 0.10
BB-21-153 16.0 16.7 0.7 0.78 0.71
BB-21-153 35.2 36.0 0.9 9.50 11.99
BB-21-153 37.6 37.8 0.2 2.80 12.80
BB-21-153 105.1 105.5 0.4 1.25 0.40
BB-21-153 122.2 122.6 0.5 2.48 0.78
BB-21-153 123.6 123.8 0.2 0.79 0.10
BB-21-153 143.7 143.9 0.2 0.74 0.10
BB-21-153 156.5 156.7 0.2 2.13 0.10
BB-21-153 157.8 158.0 0.2 4.04 0.20
BB-21-153 160.9 163.5 2.6 1.87 0.16
BB-21-153 164.8 165.0 0.2 1.56 0.10
BB-21-153 169.3 169.5 0.2 1.91 0.10
BB-21-153 174.2 174.8 0.6 2.75 1.03
BB-21-153 187.0 187.3 0.3 0.73 0.10
BB-21-153 198.0 198.5 0.5 1.84 1.20
BB-21-153 199.0 199.6 0.6 0.51 0.50
BB-21-153 205.6 205.8 0.2 26.93 1.60
BB-21-154 53.0 53.3 0.3 6.10 4.50
BB-21-154 60.3 62.8 2.5 0.83 2.81
BB-21-154 152.0 152.5 0.5 0.58 0.20
BB-21-154 166.0 167.0 1.0 0.97 0.10
BB-21-154 181.8 182.1 0.3 1.10 0.10
BB-21-154 183.5 195.5 12.0 2.30 0.55
Including 183.5 189.3 5.8 1.44 0.39
Including 190.0 190.5 0.5 0.98 0.40
Including 192.0 195.5 3.5 5.19 1.01
BB-21-154 199.1 200.4 1.3 1.12 0.28
BB-21-154 202.5 205.2 2.7 1.00 0.25
BB-21-154 205.5 208.0 2.5 0.98 0.28
BB-21-154 208.4 208.7 0.3 2.74 0.40
BB-21-154 211.5 212.0 0.5 0.68 0.50
BB-21-155 110.5 110.7 0.2 2.62 0.90
BB-21-155 112.8 113.2 0.5 6.44 13.70
BB-21-155 159.0 159.3 0.3 9.70 1.00
BB-21-155 208.0 209.0 1.0 0.75 0.10
BB-21-155 216.5 218.0 1.5 1.69 0.29
BB-21-155 220.7 226.5 5.8 2.02 0.32
BB-21-156 89.5 90.0 0.5 0.56 3.00
BB-21-156 90.5 91.5 1.0 1.03 3.00
BB-21-156 94.7 94.9 0.2 0.69 1.40
BB-21-156 97.1 97.4 0.3 0.73 25.70
BB-21-156 210.5 211.0 0.5 0.57 0.40
BB-21-156 218.0 221.0 3.0 1.31 0.20
BB-21-156 227.6 228.0 0.4 0.54 0.40
BB-21-156 246.1 248.0 1.9 2.63 0.44
BB-21-156 257.5 258.5 1.0 0.62 0.10
BB-21-156 259.5 264.0 4.5 1.85 0.32
BB-21-156 264.5 265.0 0.5 0.64 0.20
BB-21-156 269.5 270.0 0.5 1.10 0.40
BB-21-156 275.0 280.0 5.0 0.96 0.15
BB-21-156 281.0 281.4 0.4 0.73 0.10
BB-21-157 58.3 58.5 0.2 2.38 2.10
BB-21-157 123.0 123.7 0.7 1.54 8.80
BB-21-157 172.0 173.6 1.6 2.30 0.78
BB-21-157 216.0 216.5 0.5 2.06 2.20
BB-21-157 241.4 245.5 4.1 1.83 0.72
BB-21-158 131.9 132.1 0.2 0.88 1.10
BB-21-158 144.1 144.3 0.2 5.67 5.20
BB-21-158 148.0 149.5 1.5 1.04 1.89
BB-21-158 243.2 243.4 0.2 2.78 0.60
BB-21-158 252.5 255.5 3.0 4.19 0.28
BB-21-158 257.0 257.3 0.3 1.27 0.80
BB-21-158 258.4 259.5 1.1 0.99 0.61
BB-21-158 266.0 277.0 11.0 1.80 0.29
BB-21-159 105.4 105.6 0.2 0.92 0.50
BB-21-159 158.6 159.4 0.8 1.86 2.95
BB-21-159 269.7 270.0 0.3 0.58 0.10
BB-21-159 278.4 278.6 0.2 0.54 0.10
BB-21-159 278.9 279.1 0.2 0.50 0.10
BB-21-159 286.6 286.8 0.2 0.53 6.80
BB-21-159 289.7 290.4 0.7 3.33 0.10
BB-21-159 292.1 294.1 2.0 1.02 0.30
BB-21-159 295.0 297.0 2.0 1.99 0.34
BB-21-159 297.6 298.6 1.0 2.06 0.20
BB-21-159 300.2 302.1 1.9 2.70 0.42
BB-21-160 60.6 60.8 0.2 0.50 0.10
BB-21-160 222.0 223.0 1.0 2.99 0.64
BB-21-160 228.0 229.0 1.0 0.74 0.40
BB-21-160 261.0 266.0 5.0 2.13 0.78
BB-21-160 285.5 286.0 0.5 1.11 0.30
BB-21-160 288.0 290.0 2.0 1.82 0.20
BB-21-160 291.0 292.0 1.0 1.15 0.10
BB-21-161 98.3 98.5 0.2 4.42 4.30
BB-21-161 195.0 195.2 0.3 0.67 2.20
BB-21-161 263.2 263.4 0.2 1.64 0.10
BB-21-161 305.0 306.0 1.0 1.25 0.36
BB-21-161 307.1 307.5 0.4 0.74 0.40
BB-21-161 308.3 310.5 2.3 4.13 0.81
BB-21-161 311.0 313.0 2.0 1.48 0.15
BB-21-161 313.6 314.3 0.6 1.84 0.10
BB-21-161 317.8 318.1 0.3 4.81 0.70
BB-21-161 321.6 322.1 0.4 0.53 0.20
BB-21-161 323.7 324.0 0.3 3.39 0.70
BB-21-161 328.1 328.4 0.3 0.76 0.10
BB-21-162 70.0 71.0 1.0 0.40 0.95
BB-21-162 102.0 105.3 3.3 0.92 0.26
BB-21-162 107.4 111.0 3.6 1.64 0.86
BB-21-162 114.2 115.0 0.8 0.96 0.50
BB-21-162 123.0 124.5 1.5 1.86 0.86
BB-21-162 139.0 140.5 1.5 0.49 0.27
BB-21-162 143.9 146.5 2.6 1.33 0.14
BB-21-162 150.0 150.5 0.5 2.78 1.30
BB-21-162 162.5 167.0 4.5 1.47 0.82
BB-21-162 168.0 168.5 0.5 0.93 0.90
BB-21-163 89.7 89.9 0.2 3.46 0.10
BB-21-163 134.3 135.0 0.8 0.79 12.26
BB-21-163 277.0 278.0 1.0 0.55 0.20
BB-21-163 331.8 332.5 0.7 0.91 0.50
BB-21-163 335.5 336.0 0.5 0.69 0.60
BB-21-163 336.9 339.0 2.1 1.65 0.41
BB-21-163 343.2 344.0 0.8 1.64 0.43
BB-21-163 365.0 365.5 0.5 0.60 0.50
BB-21-163 367.5 368.8 1.3 1.19 0.64
BB-21-163 371.5 372.0 0.5 2.42 0.80
BB-21-163 373.5 375.5 2.0 1.50 0.88
BB-21-163 380.5 382.0 1.5 1.22 0.33
BB-21-163 384.5 385.5 1.0 0.85 0.30
BB-21-164 39.1 39.6 0.5 2.99 1.00
BB-21-165 32.0 33.8 1.8 0.65 0.16
BB-21-166 140.8 141.5 0.7 5.52 Pending
BB-21-167 219.0 219.3 0.2 33.35 5.40
BB-21-167 346.9 354.0 7.1 3.72 0.39
Including 350.5 354.0 3.5 5.69 0.48
BB-21-168 394.4 395.1 0.7 5.92 2.67
BB-21-168 399.5 400.0 0.5 6.63 1.00
BB-21-168 405.2 405.4 0.2 5.73 1.10
BB-21-168 408.7 408.9 0.2 16.79 1.70
BB-21-169 Pending
BB-21-170 36.5 37.7 1.2 12.43 2.15
Including 37.0 37.2 0.2 50.60 7.90
BB-21-170 38.4 39.0 0.6 0.80 0.70
BB-21-170 42.5 43.1 0.6 0.66 0.80
BB-21-171 Pending
BB-21-172 No Significant Results
BB-21-173 No Significant Results
BB-21-174 No Significant Results
BB-21-175 46.0 49.9 3.9 0.86 0.37
Including 47.9 48.1 0.2 6.787 1.6
BB-21-175 61.2 62.0 0.8 0.51 1.29
BB-21-175 72.7 73.3 0.6 0.55 2.31
BB-21-175 91.4 91.6 0.2 17.08 3.28
BB-21-175 128.1 128.3 0.2 11.48 2.75
BB-21-175 131.7 131.9 0.2 10.19 2.06
BB-21-176 60.4 60.8 0.3 10.68 2.70
Hammerdown
MP-20-166 45.0 46.0 1.0 0.94 0.20
MP-20-166 49.0 50.0 1.0 0.68 0.60
MP-20-166 51.0 51.4 0.4 0.59 0.10
MP-20-167 30.5 31.5 1.0 4.05 0.10
MP-20-167 34.0 35.8 1.8 1.82 0.16
MP-20-167 61.0 62.0 1.0 0.99 0.10
MP-20-167 63.2 64.0 0.9 0.74 0.30
MP-20-168 51.0 52.0 1.0 0.69 0.10
MP-20-168 54.0 55.0 1.0 1.21 0.30
MP-20-169 20.3 21.0 0.8 1.74 0.80
MP-20-169 22.0 22.2 0.2 0.55 0.50
MP-20-169 67.5 68.0 0.6 0.83 0.90
MP-20-170 13.0 14.0 1.0 0.74 0.80
MP-20-170 79.7 79.9 0.2 10.61 0.70
MP-20-170 92.1 93.0 0.9 0.54 0.20
MP-20-171 No Significant Results
MP-20-172 7.0 8.0 1.0 2.08 0.70
MP-20-172 19.0 20.0 1.0 1.69 1.10
MP-20-173 4.7 4.8 0.2 37.08 13.70
MP-20-173 14.1 14.6 0.4 15.22 5.05
MP-20-173 26.9 27.1 0.2 2.54 3.80
MP-20-173 30.0 31.0 1.0 1.05 1.40
MP-20-173 51.2 51.4 0.2 0.79 0.60
MP-20-174 13.0 14.4 1.4 4.14 3.61
MP-20-174 17.0 18.0 1.0 1.02 0.30
MP-20-174 43.0 43.3 0.3 0.61 0.70
MP-20-175 3.0 3.9 0.9 1.85 2.30
MP-20-175 38.1 38.3 0.2 9.98 2.70
MP-20-176 No Significant Results
MP-20-177 34.9 35.2 0.4 0.19 5.10
MP-20-178 21.3 21.5 0.2 1.57 1.10
MP-20-178 58.0 58.3 0.2 1.55 0.90

 

Hole ID Northing Easting Elevation Collar Azimuth Collar Dip Total Depth (m)
Orion
BB-21-150 5487954 554222 217 319áµ’ -52áµ’ 151
BB-21-151 5487545 553793 213 317áµ’ -55áµ’ 370
BB-21-152 5487711 553830 209 318áµ’ -52áµ’ 172
BB-21-153 5487663 553849 212 320áµ’ -53áµ’ 232
BB-21-154 5487683 553893 213 316áµ’ -53áµ’ 241
BB-21-155 5487692 553946 215 316áµ’ -52áµ’ 262
BB-21-156 5487591 553830 213 317áµ’ -54áµ’ 319
BB-21-157 5487629 553873 214 319áµ’ -54áµ’ 280
BB-21-158 5487638 553939 216 314áµ’ -55áµ’ 322
BB-21-159 5487606 553911 216 315áµ’ -55áµ’ 331
BB-21-160 5487583 553877 215 315áµ’ -54áµ’ 340
BB-21-161 5487555 553849 215 320áµ’ -53áµ’ 382
BB-21-162 5487660 553782 208 318áµ’ -52áµ’ 202
BB-21-163 5487525 553832 216 315áµ’ -56áµ’ 439
BB-21-164 5487415 553408 199 317áµ’ -54áµ’ 322
BB-21-165 5487465 553305 186 318áµ’ -52áµ’ 198
BB-21-166 5487665 553956 216 317áµ’ -54áµ’ 331
BB-21-167 5487590 553961 220 316áµ’ -55áµ’ 421
BB-21-168 5487518 553915 220 315áµ’ -56áµ’ 481
BB-21-169 553898 5487447 212 314áµ’ -57áµ’ 514
BB-21-170 5488030 554260 214 319áµ’ -51áµ’ 82
BB-21-171 5488062 554294 214 321áµ’ -51áµ’ 130
BB-21-172 5488051 553956 195 305áµ’ -62áµ’ 322
BB-21-173 5488457 554047 181 306áµ’ -44áµ’ 94
BB-21-174 5487898 553837 199 305áµ’ -61áµ’ 262
BB-21-175 5488092 554337 214 321áµ’ -50áµ’ 148
BB-21-176 5488126 554374 213 319áµ’ -50áµ’ 112
Hammerdown
MP-20-166 5489024 554762 196 179áµ’ -54áµ’ 61
MP-20-167 5489015 554737 195 180áµ’ -56áµ’ 70
MP-20-168 5489026 554713 195 178áµ’ -46áµ’ 61
MP-20-169 5489028 554687 191 179áµ’ -55áµ’ 112
MP-20-170 5489067 554713 191 179áµ’ -54áµ’ 130
MP-20-171 5489062 554762 193 180áµ’ -53áµ’ 100
MP-20-172 5489041 555000 200 179áµ’ -55áµ’ 61
MP-20-173 5489036 555100 201 180áµ’ -46áµ’ 112
MP-20-174 5489043 555150 200 182áµ’ -41áµ’ 55
MP-20-175 5489046 555100 201 180áµ’ -60áµ’ 61
MP-20-176 5489247 554837 177 180áµ’ -62áµ’ 301
MP-20-177 5489250 554862 177 180áµ’ -61áµ’ 151
MP-20-178 5489198 554951 187 180áµ’ -50áµ’ 121

 

Table 2: Whisker Valley

Hole ID From To Length Au g/t – Tot Metallics Au g/t – Fire Assay Ag g/t Cu % Zn % Pb %
WH-20-07 32.4 32.6 0.2 3.25 16.70 6.79 0.03 0.03
WH-20-08
WH-20-09
WH-20-10 15.4 15.6 0.2 0.68 0.40 0.00 0.00 0.00
WH-20-10 18.0 18.2 0.2 0.91 0.60 0.00 0.01 0.00
WH-20-10 186.0 186.2 0.2 1.31 2.60 0.00 0.02 0.00
WH-20-10 199.9 200.3 0.4 0.64 2.10 0.03 0.07 0.00
WH-20-10 275.6 275.8 0.2 2.09 0.80 0.01 0.01 0.00
WH-20-11 72.5 73.0 0.5 2.78 4.90 0.12 0.00 0.00
WH-20-11 86.1 88.0 1.9 2.99 3.71 2.50 0.05 0.00 0.02
Including 86.1 86.5 0.4 5.06 5.06 0.30 0.05 0.00 0.04
and 87.1 88.0 0.9 3.92 5.44 5.00 0.07 0.00 0.01
WH-20-12 93.6 93.9 0.3 23.40 46.80 0.64 0.01 0.01
WH-20-12 108.1 108.3 0.2 1.00 2.00 0.01 0.00 0.00
WH-20-12 167.0 173.3 6.3 5.74 4.67 2.49 0.06 0.01 0.01
Including 167.0 167.5 0.5 22.42 21.16 14.08 0.35 0.01 0.11
and 170.7 173.3 2.6 9.63 7.27 3.06 0.08 0.01 0.01
WH-20-13 175.6 175.8 0.2 2.94 5.40 0.08 0.01 0.00
WH-20-14 52.7 53.1 0.4 0.93 15.30 0.02 0.01 0.04
WH-20-15 74.8 75.0 0.2 1.55 0.40 0.00 0.01 0.00
WH-20-15 99.0 99.9 0.9 2.21 5.83 0.09 0.01 0.00
WH-20-15 112.7 112.9 0.2 0.81 1.80 0.09 0.03 0.02
WH-20-15 113.4 114.1 0.6 7.03 12.82 0.09 0.01 0.00
WH-20-15 114.6 114.8 0.2 0.99 3.30 0.04 0.01 0.00
WH-20-15 150.6 150.8 0.2 1.43 4.80 0.01 0.01 0.00
WH-20-16 18.4 19.7 1.4 1.68 3.01 0.02 0.02 0.00
WH-20-17 108.0 108.7 0.7 0.50 0.70 0.04 0.01 0.00
WH-20-17 136.1 136.3 0.2 0.69 1.50 0.06 0.02 0.00
WH-20-17 159.2 159.4 0.2 1.55 1.49 5.50 0.02 0.01 0.00
WH-20-17 160.6 160.9 0.3 10.46 9.81 26.00 0.32 0.01 0.01
WH-20-17 163.3 163.5 0.2 6.63 5.80 11.00 0.07 0.00 0.01
WH-20-17 169.2 169.4 0.2 0.67 2.20 0.01 0.01 0.00
WH-20-17 173.5 173.7 0.2 1.36 3.80 0.00 0.00 0.00
WH-20-17 174.7 175.4 0.7 1.74 2.33 0.06 0.01 0.00
WH-20-17 229.4 229.6 0.2 4.51 7.40 0.16 0.01 0.02
WH-20-17 231.6 231.8 0.2 2.85 2.10 0.01 0.00 0.02
WH-20-17 236.1 236.3 0.2 1.72 2.50 0.08 0.03 0.11
WH-20-17 246.8 247.7 0.8 4.57 3.79 0.08 0.01 0.05
WH-20-18 70.3 70.5 0.2 0.55 2.10 0.16 0.00 0.00
WH-20-18 86.5 86.7 0.2 0.58 1.80 0.04 0.00 0.02
WH-20-18 89.8 90.0 0.2 2.02 1.80 0.01 0.01 0.00
WH-20-18 96.8 97.0 0.2 1.76 5.10 0.02 0.00 0.00
WH-20-18 98.1 98.3 0.2 3.66 10.50 0.05 0.00 0.00
WH-20-18 120.9 121.1 0.2 3.57 8.80 0.05 0.00 0.00
WH-20-18 126.2 126.5 0.3 0.56 0.40 0.00 0.01 0.00
WH-20-18 155.1 155.6 0.5 0.52 0.30 0.00 0.01 0.00
WH-20-18 156.1 156.3 0.2 0.95 0.90 0.01 0.01 0.00
WH-20-18 157.6 157.8 0.2 0.59 0.60 0.14 0.02 0.00
WH-20-18 165.3 165.6 0.3 1.48 4.00 0.22 0.00 0.09
WH-20-18 166.9 167.4 0.5 1.64 0.90 0.05 0.00 0.05
WH-20-19 87.6 88.5 0.9 3.33 2.49 0.01 0.01 0.00
Including 87.6 87.9 0.3 6.96 4.70 0.01 0.01 0.00
WH-20-20 66.3 66.5 0.2 0.52 1.70 0.02 0.10 0.15
WH-20-20 71.2 72.4 1.2 5.07 3.78 0.03 0.00 0.00
Including 71.9 72.4 0.5 11.07 8.49 0.05 0.00 0.01
WH-20-20 73.1 73.4 0.3 1.52 3.60 0.19 0.22 0.03
WH-20-20 92.1 92.3 0.2 4.48 2.00 0.02 0.01 0.00
WH-20-20 127.3 127.6 0.4 0.88 0.60 0.00 0.01 0.00
WH-20-20 128.1 130.0 1.9 0.63 0.77 0.02 0.01 0.00
WH-20-20 136.3 136.5 0.2 0.67 1.50 0.01 0.00 0.00
WH-20-20 191.7 192.9 1.2 3.53 1.83 0.14 0.01 0.00
Including 191.7 191.9 0.2 18.24 6.00 0.65 0.01 0.00
WH-20-21 76.3 76.5 0.2 0.61 0.80 0.02 0.01 0.00
WH-20-21 78.9 79.1 0.2 0.79 0.80 0.03 0.01 0.00
WH-20-22 7.0 7.6 0.6 0.54 0.30 0.00 0.00 0.00
WH-20-22 8.1 9.2 1.1 4.23 3.06 0.07 0.01 0.02
Including 8.1 8.3 0.2 12.60 8.60 0.02 0.01 0.04
and 9.0 9.2 0.2 9.39 7.00 0.33 0.01 0.07
WH-20-22 28.9 29.1 0.2 6.81 6.20 0.29 0.00 0.00
WH-20-22 31.7 32.4 0.7 0.83 1.07 0.02 0.01 0.01
WH-20-22 35.2 35.9 0.6 0.55 0.20 0.00 0.00 0.00
WH-20-22 41.5 41.7 0.2 2.19 5.60 0.06 0.00 0.00

 

Hole ID Northing Easting Elevation Collar Azimuth Collar Dip Total Depth (m)
WH-20-07 5496699 548240 298 149áµ’ -43áµ’ 160
WH-20-08 5497126 547155 308 358áµ’ -46áµ’ 241
WH-20-09 5496901 547044 319 357áµ’ -44áµ’ 211
WH-20-10 5497302 547288 301 1áµ’ -45áµ’ 313
WH-20-11 5496654 548010 282 1áµ’ -44áµ’ 220
WH-20-12 5496595 547681 281 1áµ’ -46áµ’ 316
WH-20-13 5496775 547453 304 357áµ’ -46áµ’ 238
WH-20-14 5497029 547230 315 0áµ’ -44áµ’ 151
WH-20-15 5496771 547276 322 359áµ’ -48áµ’ 274
WH-20-16 5496833 547359 317 182áµ’ -42áµ’ 244
WH-20-17 5496517 547680 279 359áµ’ -45áµ’ 281
WH-20-18 5496586 547732 280 0áµ’ -50áµ’ 273
WH-20-19 5498090 547251 284 0áµ’ -50áµ’ 151
WH-20-20 5496592 547629 283 359áµ’ -42áµ’ 205
WH-20-21 5496648 547959 281 0áµ’ -45áµ’ 82
WH-20-22 5496947 547465 305 1áµ’ -48áµ’ 49

 

About Maritime Resources Corp.

Maritime holds a 100% interest- directly and subject to option agreements entitling it to earn 100% ownership- in the Green Bay Property. This includes the former Hammerdown gold mine and the Orion gold project plus the Whisker Valley exploration project, all located in the Baie Verte Mining District near the town of King’s Point, Newfoundland and Labrador. The Hammerdown Gold Project is characterized by near-vertical, narrow mesothermal quartz veins containing gold associated with pyrite. Hammerdown was last operated by Richmont Mines between 2000 and 2004. The Company also owns the gold circuit at the Nugget Pond metallurgical facility in Newfoundland and Labrador, the Lac Pelletier gold project in Rouyn Noranda, Québec and several other exploration properties and royalty interests in key mining camps across Canada.

On Behalf of the Board:

Garett Macdonald, MBA, P.Eng.
President and CEO

For further information, please contact:

Tania Barreto, CPIR
Head of Investor Relations
1900-110 Yonge Street, Toronto, ON M5C 1T4
www.maritimeresourcescorp.com
Twitter
Facebook
LinkedIn
YouTube

Qualified Person:

Exploration activities at the Hammerdown Gold Project and Whisker Valley are administered on site by the Company’s Exploration Manager, Larry Pilgrim, P.Geo and Technical Advisor Jeremy Niemi, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Larry Pilgrim, P.Geo. Exploration Manager, is the Qualified Person for the Company and has reviewed and approved the technical and scientific content of this news release.

Caution Regarding Forward-Looking Statements:

Certain of the statements made and information contained herein is “forward-looking information” within the meaning of National Instrument 51-102 – Continuous Disclosure Obligations. Forward-looking statements are often identified by terms such as “will”, “may”, “should”, “anticipate”, “expects”, “intends”, “indicates” “plans” and similar expressions. Forward-looking statements include statements concerning the potential to increase mineral resource and mineral reserve estimates, the Company’s decision to restart the Project, the Company’s plans regarding depth extension of the deposit at Hammerdown, the Company’s plans regarding completing additional infill and grade control testing within the PEA mine plan, the Company’s plans regarding drilling targets previously identified, the anticipated timing of receiving permits for construction and development of Hammerdown and, and the Company’s acquisition of new mineral property interests and assets, amongst other things, which involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. All forward-looking statements and forward-looking information are based on reasonable assumptions that have been made by the Company in good faith as at the date of such information. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, base metal concentrates, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the use of ore sorting technology will produce positive results, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. Forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, the ability of the Company to continue to be able to access the capital markets for the funding necessary to acquire, maintain and advance exploration properties or business opportunities; global financial conditions, including market reaction to the coronavirus and economic consequences thereof; competition within the industry to acquire properties of merit or new business opportunities, and competition from other companies possessing greater technical and financial resources; difficulties in advancing towards a development decision at Hammerdown and executing exploration programs at its Newfoundland and Labrador properties on the Company’s proposed schedules and within its cost estimates, whether due to weather conditions, availability or interruption of power supply, mechanical equipment performance problems, natural disasters or pandemics in the areas where it operates; increasingly stringent environmental regulations and other permitting restrictions or maintaining title or other factors related to exploring of its properties, such as the availability of essential supplies and services; factors beyond the capacity of the Company to anticipate and control, such as the marketability of mineral products produced from the Company’s properties; uncertainty as to whether the acquisition of assets including the Nugget Pond gold circuit will be completed in the manner currently contemplated by the parties; uncertainty as to whether mineral resources will ever be converted into mineral reserves once economic considerations are applied; uncertainty as to whether inferred mineral resources will be converted to the measured and indicated categories through further drilling, or into mineral reserves, once economic considerations are applied; government regulations relating to health, safety and the environment, and the scale and scope of royalties and taxes on production; and the availability of experienced contractors and professional staff to perform work in a competitive environment and the resulting adverse impact on costs and performance and other risks and uncertainties, including those described in each MD&A of financial condition and results of operations. In addition, forward-looking information is based on various assumptions including, without limitation, assumptions associated with exploration results and costs and the availability of materials and skilled labour. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Accordingly, readers are advised not to place undue reliance on forward-looking information. Except as required under applicable securities legislation, Maritime undertakes no obligation to publicly update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Neither TSX Venture Exchange (“TSX-V”) nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.


Share this article

Leave a Reply

Your email address will not be published. Required fields are marked *

×