Sitka Drills 678.1 metres of 1.04 g/t Gold from Surface, Including 93.0 metres of 2.57 g/t Gold and 5.5 metres of 17.59 g/t Gold at Its RC Gold Project, Yukon
DDRCCC-24-068 (“Hole 68”) returned 678.1 metres of 1.04 g/t gold from surface, including 409.5 metres of 1.36 g/t…