Cabral Gold drills 23 metres at 4.7 g/t gold at PDM target, Cuiú Cuiú Gold District, Brazil
Cabral Gold Inc. [TSXV: CBR; OTCQB: CBGZF] reported drill results from a recently completed diamond drill hole at the Pau de Merena (PDM) target. PDM is located 2.5km NW of the Central gold deposit and within the Cuiú Cuiú district, Brazil.
Highlights: Diamond drill hole DDH346 intersected 23.3 metres at 4.7 g/t gold from 57 metres depth in hard rock below the gold-in-oxide blanket, including 1 metres at 91.3 g/t gold and 1 metre at 8.1 g/t gold. The mineralized zone remains open at depth and along strike
The mineralized zone is most likely the strike extension of the zone intersected in DDH22 which returned 8.5 metres at 5.1 g/t gold, including 0.7 metres at 30.4 g/t gold, and is one of four zones thus far identified in intrusive rocks below the gold-in-oxide blanket at PDM
Drill results are pending on the Mutum and Machichie NE targets, and diamond drilling is currently in progress at the Machichie Main and Jerimum Cima targets
Alan Carter, President and CEO, commented, “The results from diamond drill hole DDH346 at the PDM target at Cuiú Cuiú highlight the presence of several very high-grade structures in the intrusive rocks below the gold-in-oxide blanket at PDM. These four discrete structures remain open along strike and down-dip. Whilst a significantly larger gold-in-oxide blanket occurs at PDM than previously envisaged, there is increasing evidence of down-dip and along strike continuity of the four known zones of primary mineralization within the intrusive rocks below the gold-in-oxide blanket. Additional drilling is planned to determine the size of the hard rock gold resource at PDM, which is located only 2.5km northwest of the Central gold deposit.
“These drill results come soon after last weeks announcement of the US$45 million construction financing for the Phase 1 operation at Cuiú Cuiú which is aimed at the heap leach processing of the near surface gold-in-oxide material at the MG, Machichie Main and Central gold deposits at Cuiú Cuiú. The oxide material at PDM was not part of this PFS study but these results and more recent drilling at PDM in both the oxide material and the underlying intrusive rocks, augers well for expansion of the global resource base at Cuiú Cuiú.”
The PDM target is located 2.5km northwest of the Central gold deposit at Cuiú Cuiú within a prominent northwest-trending +0.1 g/t gold-in-soil anomaly, which has been traced for more than 5km along strike, and remains open. The Central gold deposit, as well as the Central SE, Central North, PDM and Mutum targets all lie within this trend.
The objective of the current drill program at PDM is to add ounces to both the current gold-in-oxide resource base, and to calculate an initial resource for the mineralized zones in the underlying primary intrusive rocks.
Previous results from initial diamond-drill holes in granitic basement rocks below the gold-in-oxide blanket at PDM include; 22.4 metres at 4.8 g/t gold, including 1.35m at 62.0 g/t gold, and 11.9m at 3.3 g/t gold, including 0.5m at 16.1 g/t gold, and 1.2m at 16.0 g/t gold in DDH239; and 18.0m at 2.5 g/t gold from 92.0m, including 3.0m at 10.5 g/t gold, in DDH275. These higher-grade intercepts occur within brecciated structural zones and mostly remain open at depth as well as along strike.
Recent drilling at the PDM target has expanded the surface area of the gold-in-oxide mineralized blanket by 50% from 0.26 km² to 0.39 km² and confirmed the existence of four NW trending and parallel mineralized zones in the underlying granitic intrusive rocks at PDM.
Results were recently received on diamond drill hole DDH346 at PDM which was drilled on section 9346907N at an angle of 60 degrees and an azimuth of 227 degrees. The hole was designed to test the down-dip continuation of the mineralized zone intersected in in DDH237 which returned 1.3 metres at 1.9 g/t gold and 2 metes at 2.4 g/t gold.
Drill hole DDH346 returned 8 metres at 0.3 g/t gold within the colluvial blanket, as well as 22.3 meters at 4.7 g/t gold from 57.2 metres depth, including two higher grade intervals of 1 metre at 91.3 g/t gold from 57.2 metres depth, and 1.1 metres at 8.1 g/t gold from 72.0m depth in highly altered fractured granite intrusive.
This mineralization occurs in hydrothermal breccia with intense quartz-sulfide veining. The hole also returned 3 metres at 1.2 g/t gold from 92.0 metres depth and 1.6 metres at 0.6 g/t gold from 114.0 metres depth.
The mineralized zone intercepted in DDH246 is almost certainly the same zone intercepted 100m to the NW in hole DDH22 which returned 8.5 metres at 5.1 g/t gold, including 0.7 meters at 30.4 g/t gold. It also suggests that grades are increasing with depth on section 9346907N at PDM.
Finally, and perhaps most importantly, it suggests the presence of narrow zones of higher-grade mineralization that may be continuous within the underlying intrusive rocks at PDM. Continuous zones of higher-grade mineralization at Cuiú Cuiú are frequently surrounded by lower-grade envelopes and have also been identified at the MG and Central gold deposits as well as at the Machichie Main, Machichie NE and Jerimum Cima discoveries. The mineralized zone intersected in DDH346 remains open down dip and along strike to the SE and to the NW.
Drill results are pending on the Mutum and Machichie NE targets, and diamond drilling is currently in progress at the Machichie Main and Jerimum Cima targets.
Cabral Gold has a primary focus on gold properties in Brazil. The company has a 100% interest in the Cuiú Cuiú gold district located in the Tapajós Region, within the state of Pará in northern Brazil. Three main gold deposits have so far been defined at the Cuiú Cuiú project which contain NI 43-101 compliant Indicated resources of 12.29Mt at 1.14 g/t gold (450,200oz) in fresh basement material and 13.56Mt at 0.50 g/t gold (216,182oz) in oxide material.
The project also contains Inferred resources of 13.63Mt at 1.04 g/t gold (455,100oz) in fresh basement material and 6.4Mt at 0.34 g/t gold (70,569oz) in oxide material. The resource estimate for the primary material is based on the NI 43-101 technical report dated October 12, 2022. The resource estimate for the oxide material at PDM and MG is based on a NI 43-101 technical report dated October 21, 2024. The resource estimate for the oxide material at Central and Machichie is based on a NI43-101 technical report (Updated PFS) dated July 29, 2025.
