Globex Mining posts more high-grade antimony assays at Bald Hill property, New Brunswick
Globex Mining Enterprises Inc. [TSX: GMX; G1MN – Frankfurt, Stuttgart, Berlin, Munich, Tradegate, Lang & Schwarz, LS Exchange, TTMzero, Düsseldorf and Quotrix Düsseldorf Stock Exchanges: G1MN; and OTCQX International in the US: GLBXF] reported that Antimony Resources Corp. [CSE: ATMY-CSE, K8JO-FSE) have reported the final drill results from their 2025 drill campaign on the Bald Hill Antimony property, Queens County, New Brunswick, under option form Globex.
The company said: “The 2025 drill programs completed a total of 8,150 metres in 34 drill holes. High-grade antimony-bearing stibnite was intersected in between 75% and 80% of the drill holes with high-grade values including 4.4% Sb over 8.6 metres, 11.74% Sb over 1.65 metres, and 8.48% Sb over 3.0 metres. The overall average grade of mineralization appears to be in the order of 4% to 5% Sb.”
Highlights from latest drilling: High-grade antimony-bearing stibnite (Sb) mineralization continues to be intersected in the drilling completed in the fall of 2025.
Multiple zones of antimony-bearing stibnite (Sb) mineralization were encountered in five of the six holes reported. Drill Hole BH-25-22 has six individual zones of antimony mineralization.
High-grades and wide intersections are seen; up to 2.07% Sb over 27.05 metres and 2.75% Sb over 18.35 metres. High-grade values include 4.4% Sb over 8.6 metres, 11.74% Sb over 1.65 metres, and 8.48% Sb over 3.0 metres. The overall average grade of mineralization appears to be in the order of 4% to 5% Sb.
Highest values of the grade times thickness to date (% Sb*m) = 55.99 and 50.46. Mineralization appears to be averaging greater than 4.5 metres in thickness.
The thickness reported in the following table are drill intersected thicknesses. The true thickness of mineralization is calculated to be approximately 75% of the intersected thickness.
