Lithium X2 Mining files Pre-Feasibility Study for Nevada North Lithium Project, Nevada

Share this article

Lithium X2 Mining Inc. [TSXV: LIXX; OTCQX: LIXMF; FSE: 9WI], (formerly Surge Battery Metals Inc.) reported that it has filed an independent NI 43-101 Technical Report for its 2026 Pre-Feasibility Study (PFS) for the Nevada North Lithium Project (NNLP) located in Elko County, north of Wells, Nevada.

The Technical Report supports the PFS results announced on October 2, 2026 and contains no material differences from those results. The NNLP is held by Nevada North Lithium LLC (NNL), a joint venture owned 67.5% by Lithium X2 and 32.5% by Evolution Mining Ltd. [OTC Pink: CAHPF].

NNLP PFS Highlights: After-tax NPV8%: US$9.81 Billion, IRR of 23.6% at US$24,000/t lithium carbonate price.

Operating cost (OPEX): US$4,719/t lithium carbonate, 10% lower than the 2025 Preliminary Economic Assessment (PEA).

First Mineral Reserve for the NNLP: Proven and Probable Mineral Reserve of 218.3 Mt at 3,928 ppm Li containing 4.56 Mt lithium carbonate equivalent (LCE).

PFS mine and processing plan produces 3.87 Mt of battery-grade lithium carbonate over the 42-year life-of-mine (LOM)

Average annual production of approximately 92,250 tonnes of lithium carbonate. Overall lithium recovery of 84.9%, up from 82.8% in the PEA.

Lithium plant will be built in two phases. Phase 1 (P1) Capital Cost (CAPEX): US$2.77 Billion, Phase 2 (P2) CAPEX: US$2.35 Billion, total of US$5.12 Billion.

Sustaining Capital: US$1.65 Billion. After-tax payback: 4.2 years.

LOM after-tax cash flow (undiscounted): US$56.3 Billion

The PFS, completed by lead consultant Fluor Enterprises, Inc. with Independent Mining Consultants, Inc. (IMC) and RESPEC Company, LLC (RESPEC), confirms robust economics for a low operating cost, large-scale and long-life conventional open pit and filtered tailings operation producing battery-grade lithium carbonate through on-site beneficiation and sulfuric acid leaching.

The plant is built in two phases, each a processing train with a design capacity of approximately 55,900 tonnes per year of battery-grade lithium carbonate. All material is expected to be free digging, and the waste-to-ore ratio is 0.88:1.

The PFS mine plan is based solely on Proven and Probable Mineral Reserves, with an effective date of July 28, 2026, estimated by IMC. The Technical Report, titled “Nevada North Lithium Project, NI 43-101 Technical Report, Pre-Feasibility Study”, has an effective date of October 2, 2026 and a report date of November 16, 2026. The Technical Report presents the Mineral Resource estimate with an updated effective date of July 20, 2026, which adds cesium and rubidium as accessory metals; lithium tonnes, grades and contained LCE are unchanged from the estimate disclosed on October 2, 2026. Cesium and rubidium are not included in the Mineral Reserve or the economic analysis.

The PFS economic analysis includes no Inferred Mineral Resources. The PFS Phase 1 capital and operating cost estimates are AACE Class 4 (±25%); the Phase 2 capital cost is a planning-level estimate derived from Phase 1. There is no certainty that the results of the PFS will be realized.

The figures shown above are on a 100% NNLP basis in US dollars and represent the NNLP’s potential economics at the stated lithium carbonate price assumption. The NNLP’s sensitivity to lithium carbonate price, grade, and capital and operating costs is detailed in the Technical Report; the after-tax NPV8% remains positive across a ±30% range in every variable tested.

Greg Reimer, President, CEO and a director of Lithium X2, commented, “Filing the Technical Report completes the pre-feasibility stage at Nevada North and is the first major milestone we report as Lithium X2. The report establishes the NNLP’s first Mineral Reserve and puts the full engineering, metallurgical and economic basis for a 42-year operation on the public record. With our joint venture partner Evolution, our focus now turns to the feasibility study, pilot plant testing and permitting required to reach a final investment decision.”

The Nevada North Lithium Project is in Elko County in northern Nevada, USA, approximately 74 km north of Wells and 140 km northeast of Elko. The NNLP is accessible from U.S. Highway 93 via unimproved roads with good regional infrastructure. Northern Nevada is a major hub for open pit mining operations and is recognized as one of the most concentrated areas in the world for skilled mining labor. Nevada is home to experienced regulators, where federal and State of Nevada agencies follow well-established protocols for hard rock mine permitting.

The NNLP hosts a Proven and Probable Mineral Reserve of 218.3 Mt at 3,928 ppm Li containing 4.56 Mt LCE (effective July 28, 2026), within a pit-constrained Measured and Indicated Mineral Resource of 657.5 Mt at 3,007 ppm Li containing 10.5 Mt LCE and an Inferred Mineral Resource of 271.3 Mt at 2,160 ppm Li containing 3.1 Mt LCE (effective July 20, 2026), all at a cut-off grade of 1,250 ppm Li. Mineral Resources are reported inclusive of Mineral Reserves. Key assumptions, parameters and methods are set out in the Technical Report and in the Company’s news release dated October 2, 2026.

Lithium X2 Mining Inc., a mineral exploration company, is at the forefront of securing the supply of domestic lithium through its active engagement in the Nevada North Lithium Project. The project focuses on development of high-grade lithium energy metals in Nevada, a crucial element for powering battery electric storage and electric vehicles.

Evolution Mining is a leading, globally relevant gold miner. Evolution operates six mines, comprising five wholly owned mines: Cowal in New South Wales, Ernest Henry and Mt Rawdon in Queensland, Mungari in Western Australia, and Red Lake in Ontario, Canada, and an 80% share in Northparkes in New South Wales.


Resource World Magazine Inc. has prepared this editorial for general information purposes only and should not be considered a solicitation to buy or sell securities in the companies discussed herein. The information provided has been derived from sources believed to be reliable but cannot be guaranteed. This editorial does not take into account the readers investment criteria, investment expertise, financial condition, or financial goals of individual recipients and other concerns such as jurisdictional and/or legal restrictions that may exist for certain persons. Recipients should rely on their own due diligence and seek their own professional advice before investing.