Purepoint and IsoEnergy to drill Q24 and Nova uranium targets at Dorado Project, Saskatchewan
Purepoint Uranium Group Inc. [TSXV: PTU; OTCQB: PTUUF] reported that its 50/50 joint venture with IsoEnergy Ltd. [TSX: ISO; NYSE American: ISOU] has approved an exploration plan for 2027, including 14 diamond drill holes totaling 7,700 metres at the Dorado Project in Saskatchewan’s eastern Athabasca Basin.
The plan prioritizes follow up drilling at the newly identified Q24 uranium target, where the first hole intersected 7.4 metres of elevated radioactivity at the unconformity, and additional exploration surrounding the high grade Nova discovery. Airborne geophysical surveys are also planned across the joint venture’s Aurora and Celeste properties.
“Our first hole at Q24 intersected 7.4 metres of elevated radioactivity at the unconformity, giving us a compelling new target to pursue,” said Chris Frostad, President and CEO of Purepoint Uranium. “We are planning nine holes to determine how far that mineralization extends. At Nova, we have identified additional targets using our latest geophysical results. Together, these programs give us several opportunities to build on the discoveries and exploration successes of the past two years.”
Highlights: 7,700 metres of drilling planned at Dorado across 14 diamond drill holes targeting the Q24 and Nova uranium zones.
Q24 Winter Program: nine holes totaling 4,950 metres will follow up PG26-11, which intersected 7.4 metres averaging 8,760 counts per second (cps), with a maximum reading of 50,110 cps.
Nova Summer Program: five holes totalling 2,750 metres will test new targets southwest and northeast of the high grade Nova discovery, guided by structural interpretations from the 2026 MobileMT survey.
Aurora and Celeste Exploration: Airborne magnetotelluric surveys will investigate deep seated conductive structures and identify additional targets for future drilling.
2027 Exploration Schedule: Winter drilling is targeted for January through March, with summer drilling and airborne surveys planned for July and August.
The first phase of the 2027 exploration plan focuses on the Q24 target, where summer 2026 drilling identified a new zone of elevated radioactivity along a previously untested conductive structure.
Drill hole PG26-11 intersected 7.4 metres of elevated radioactivity from 284.1 to 291.5 metres, averaging 8,760 cps and reaching a maximum of 50,110 cps. The interval spans the unconformity and occurs directly above a graphitic basement conductor, a classic geological setting for uranium mineralization in the Athabasca Basin.
The hole also intersected additional zones of elevated radioactivity below the primary interval, together with a nearby chalcopyrite vein. These observations provide further evidence of geological processes commonly associated with uranium mineralization.
The planned winter program consists of nine drill holes totaling approximately 4,950 metres. The holes will test step outs northwest and southeast of PG26-11 to investigate the continuity, orientation and extent of the mineralized system.
Winter access preparations are planned for December 2026, with drilling targeted to begin in January 2027 and continue through March.
The second drilling phase will return to the Nova discovery within the Q48 grid, where previous exploration has identified high grade uranium mineralization within a complex system of basement structures.
Drill hole PG25-07A returned 1.62% U₃O₈ over 2.1 metres, including 8.13% U₃O₈ over 0.4 metres. Additional drilling has confirmed uranium mineralization at several locations within the Nova conductive corridor.
The 2026 airborne MobileMT survey, comprising 2,390 line-km across Dorado, provided new insight into the distribution of conductive structures surrounding Nova.
Of particular interest is conductive and structurally complex features within previously untested areas immediately southwest and northeast of the Nova discovery.
The summer program calls for five helicopter supported diamond drill holes totaling approximately 2,750 metres. These holes will investigate the relationship between the newly interpreted structures, favourable basement geology and the uranium mineralization previously encountered at Nova. Drilling is currently planned for July and August 2027.
Beyond the Dorado drilling programs, the joint venture has approved plans for airborne magnetotelluric surveys across the Aurora Main, Celeste North and Celeste South properties.
The surveys are designed to identify conductive basement structures associated with favourable geological environments for uranium mineralization and provide a foundation for future drill targeting.
The Aurora Project lies immediately east of Dorado along the eastern margin of the Athabasca Basin, near established uranium deposits and mining infrastructure. Historical exploration has identified numerous conductive corridors, structural targets and areas of anomalous uranium mineralization.
The Celeste Block comprises several prospective claim groups southwest of the Rabbit Lake and McClean Lake operations. Previous exploration has identified conductive trends, alteration and anomalous uranium mineralization that warrant additional investigation. The airborne surveys are planned for July and August 2027.
The 2027 plan follows a substantial year of exploration at Dorado, during which the joint venture completed 8,879 metres of diamond drilling in 16 holes, with five additional restart holes, and conducted an extensive airborne MobileMT survey.
The drilling advanced the geological understanding of the Nova discovery while identifying new opportunities along the broader Dorado conductive system.
At Q24, the first drill hole encountered significant elevated radioactivity at the unconformity and above a graphitic basement conductor, establishing an additional priority target for follow up.
The MobileMT survey also identified previously unrecognized conductive structures, expanding the number of prospective areas that warrant further investigation.
Together, these results have established a technical foundation for the next phase of exploration, combining immediate follow up drilling at Q24, additional testing around Nova and continued target development across the joint venture’s extensive eastern Athabasca Basin land package.
Established in December 2024, the joint venture brings together a portfolio of uranium exploration properties in Saskatchewan’s eastern Athabasca Basin. The portfolio currently encompasses approximately 101,453 hectares across the Dorado, Aurora and Celeste properties.
The joint venture is owned equally by Purepoint Uranium Group Inc. and IsoEnergy Ltd., with Purepoint serving as operator during the exploration phase.
The Dorado Project covers approximately 41,784 hectares along the highly prospective Larocque Trend, which hosts numerous uranium occurrences and IsoEnergy’s high grade Hurricane deposit.
Dorado contains more than 150 km of electromagnetic conductors associated with graphitic basement rocks and complex structural features. These geological characteristics are important controls on uranium mineralization throughout the Athabasca Basin.
Exploration is currently focused on the Nova discovery and Q24 target, together with several additional prospective conductive corridors.
The Aurora Project encompasses approximately 53,046 hectares immediately east of Dorado along the eastern margin of the Athabasca Basin.
The property hosts an extensive network of electromagnetic conductors, including several areas where historical drilling has intersected uranium mineralization, alteration and favourable basement structures.
The Celeste Block encompasses approximately 6,623 hectares across four separate areas: Celeste North, South, East and West.
The properties cover prospective conductive trends in the eastern Athabasca Basin, near established uranium deposits and mining infrastructure.
Purepoint Uranium Group Inc. is a uranium exploration company operating at the heart of the Athabasca Basin – the world’s premier high-grade uranium district. Purepoint actively operates exploration programs on behalf of joint venture partnerships with three of the world’s leading uranium companies: Cameco Corp., Orano Canada Inc. and IsoEnergy Ltd.
Purepoint operates the Dorado Project under a 50/50 joint venture with IsoEnergy Ltd., where the Nova Discovery returned confirmed assays of up to 8.1% U₃O₈ and a mineralized corridor now extends to one km. The company also operates the Aurora and Celeste Blocks with IsoEnergy and the Hook Lake and Smart Lake projects under joint venture with Cameco Corp. and Orano Canada Inc. Purepoint’s wholly owned property portfolio includes additional exploration-stage uranium assets in the Athabasca Basin region. Additionally, Purepoint holds a promising VMS project optioned to and strategically positioned adjacent to Eldorado Gold’s McIlvenna Bay Project.
